Show simple item record

dc.contributor.advisorRamos Hernández, Marta Elena
dc.contributor.authorZaldívar Avila, Yuliannis Lianet
dc.date.accessioned2022-04-04T15:37:47Z
dc.date.available2022-04-04T15:37:47Z
dc.date.issued2021
dc.identifier.citationZaldívar, Y. L. (2021). Procedimiento para Perfeccionar el Sistema de Costo en la Unidad Básica Constructora en la ECOT “Ramón de Antilla”. Tesis de Diploma, Licenciatura en Contabilidad y Finanzas, Universidad de Holguínes_ES
dc.identifier.urihttp://repositorio.uho.edu.cu/xmlui/handle/uho/8579
dc.descriptionTesis presentada en opción al título académico de Licenciado en Contabilidad y Finanzases_ES
dc.description.abstractEl país necesita hoy, más del análisis de sus gastos e ingresos pero a su vez los costos, lo que hará obtener una organización mucho más eficiente en los negocios y abrir puertas a un desarrollo más próspero y sostenible. El presente trabajo realizado en la Unidad Básica Constructora en la ECOT "Ramón de Antilla” tiene como objetivo perfeccionar el sistema de costo por proceso que permita la correcta toma de decisiones. Luego de revisar la bibliografía existente sobre los fundamentos teóricos y analizar la información mediante el intercambio con especialistas se desarrolló el trabajo, que está estructurado por dos capítulos, el primero basado en origen y evolución de costo así como su importancia, clasificación y análisis y el segundo capítulo donde se plantea el procedimiento para perfeccionar el sistema de costo con la propuesta de 3 fases (Diagnóstico, Proyección y Control y Análisis) y 10 pasos que lo integran. Para el desarrollo de esta investigación se utilizaron varios métodos y técnicas del conocimiento teórico y empírico dado el carácter sistémico que ha de tener toda investigación, como son analítico-sintético, histórico- lógico, hipotético -deductivo, observación y revisión de documentos existentes en la Unidad Básica Constructora en la ECOT"Ramón de Antilla”.es_ES
dc.description.abstractToday the country needs more analysis of its expenses and income, but at the same time the costs, in this it will make us obtain a much more efficient organization in business to sustainable development. The present work carried out in the Basic Construction at ECOT Ramon of Antilla aims to improve the cost per process system that allows correct decision-making. After reviewing the existing bibliography on the theoretical foundations and analyzing the information through the exchange with the specialists, the work was developed, which is structured by two chapters, the first based on the origin and the evolution of cost as well as its importance, classification and analysis and the second chapter where the procedure to improve the cost system is proposed with the proposal of 3 phases (Diagnosis, Projection and Control and Analysis) and 10 steps that integrate it. For the development of this research, various methods and empirical knowledge were used given the systematic nature that all research must have, such as analytical-synthetic, historical-logical, hypothetical-deductive, observation and review of existing documents in the Basic Construction Unit at ECOT Ramon of Antilla.es_ES
dc.language.isoeses_ES
dc.publisherUniversidad de Holguín, Facultad de Ciencias Empresariales y Administración, Departamento de Contabilidad y Finanzases_ES
dc.subjectSISTEMA DE COSTOSes_ES
dc.subjectPERFECCIONAMIENTO EMPRESARIALes_ES
dc.subject.otherCOSTOes_ES
dc.subject.otherCONTABILIDAD DE COSTOSes_ES
dc.subject.otherCONTROL DE PROCESOSes_ES
dc.subject.otherCOSTOS DE PRODUCCIONes_ES
dc.subject.otherGASTOS PUBLICOSes_ES
dc.subject.otherCOSTOS DE PRODUCCIONes_ES
dc.subject.otherANALISIS DEL VALOR (CONTROL DE COSTOS)es_ES
dc.subject.otherPLANIFICACION ECONOMICAes_ES
dc.subject.otherGESTION DE EMPRESASes_ES
dc.subject.otherTOMA DE DECISIONESes_ES
dc.subject.otherEMPRESAS CONSTRUCTORASes_ES
dc.titleProcedimiento para Perfeccionar el Sistema de Costo en la Unidad Básica Constructora en la ECOT “Ramón de Antilla”es_ES
dc.typebachelorThesises_ES


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record